You Order the Loose Volume and You Get the Compacted One

A four inch compacted base needs about a quarter more material than its finished volume. Order the finished figure and you run out.

Finished volume

the hole you are filling

Order this much

 

In weight

 

Cheaper quote

 

The same job in every unit a supplier might quote

How the depth changes the order

Advertisement

How the calculation works

Five inches in the truck, four inches on the ground As delivered 5.0 in loose 7.72 cu yd After compaction 4.0 in 6.17 cu yd Bars are 84 px per inch of depth, so the second is exactly four fifths of the first. Order the 4 inch figure and you finish 20 per cent short of the depth you specified.

How to Use This Tool

Enter the area and the depth you want after compaction, then set the material. The compaction allowance and the density are both editable, because both vary by supplier and by how hard the base is rolled.

Compaction is why the arithmetic is not enough

Aggregate arrives loose, with air between the stones. Rolling or tamping it drives the fines into those voids, and the layer loses height. A base specified at 4 inches compacted typically needs about 5 inches of loose material, which is a 25 per cent allowance.

Different products behave differently. Well-graded crushed base with fines compacts the most, around 20 to 30 per cent. Single-size pea gravel barely compacts at all, closer to 10 per cent, because uniform round stones have nowhere to move to. Mulch and topsoil settle rather than compact, so the allowance there is about settlement over the first season.

area          25 x 20              = 500 sq ft
finished      500 x (4/12) / 27    = 6.17 cu yd
+25% compaction                    = 7.72 cu yd
x 1.40 ton/cu yd                   = 10.80 short tons
                                   = 9.80 metric tonnes
A 25 x 20 ft driveway base, 4 inches compacted, crushed stone

Density varies more than the calculators admit

A cubic yard of crushed stone weighs roughly 1.35 to 1.45 tons; pea gravel is lighter, screened topsoil lighter again, and bark mulch is under half. Moisture moves all of these figures, sometimes by 10 per cent after rain, which is worth knowing if you are buying by weight from an uncovered stockpile.

The practical rule: if you are buying by the ton, ask the supplier for their density for that specific product rather than trusting a generic table. The number they give you goes in the density field.

Comparing quotes means converting units first

Quarries usually quote per ton. Landscape suppliers often quote per cubic yard. Bagged product is priced per bag, and a bag is commonly 0.5 cu ft, so it takes 54 bags to make a cubic yard — which is why bagged aggregate is around three times the bulk price.

Once delivery is added, the cheaper unit price frequently loses. A single delivery fee spread over a larger order is often the difference, so the comparison here includes it.

Short tons against metric tonnes

A short ton is 2,000 lb and a metric tonne is 2,205 lb, a 10 per cent gap. On a 10 ton order that is 1,000 lb of material, so it is worth confirming which one a quote means, particularly from a supplier that also sells to commercial customers.

What to add on top

Geotextile fabric under the base, edge restraint, and a separate bedding layer if you are laying pavers are all additional. This tool sizes the aggregate layer only.

Advertisement

Frequently Asked Questions

How much gravel do I need for a 25x20 driveway?
At 4 inches compacted, 6.17 cubic yards finished. Adding a 25 per cent compaction allowance gives 7.72 cubic yards to order, which is about 10.8 short tons of crushed stone base.
How many tons is a cubic yard of gravel?
Roughly 1.35 to 1.45 tons for crushed stone base, 1.25 to 1.35 for pea gravel and about 1.15 for screened topsoil. Moisture can move all of these by up to 10 per cent, so ask your supplier for their figure.
Why do I need extra gravel for compaction?
Loose aggregate has air between the stones. Rolling drives the fines into those voids and the layer loses about a fifth of its height, so 5 inches of loose material finishes at 4 inches. Ordering the finished volume leaves you short.
How deep should a gravel driveway base be?
Four inches compacted is typical for cars on stable subgrade, six to eight where there is heavy traffic or soft ground. Depth drives volume linearly, so going from four to six inches is fifty per cent more material.
Is bagged gravel more expensive than bulk?
Considerably. A common bag holds 0.5 cu ft, so a cubic yard takes 54 bags. That usually works out around three times the bulk price, which is why bags only make sense for small repairs or where a truck cannot reach.
Is a ton of gravel the same as a tonne?
No. A short ton is 2,000 lb, a metric tonne is 2,205 lb. The 10 per cent difference is worth a thousand pounds on a ten ton order, so it is worth checking which unit a quote uses.

Related tools in Home & Construction

Browse all Home & Construction tools
The Mac mini the ecech. site is built on, beside a handwritten note reading ecech.com.

Made by one person

ecech. is not a content farm. Every tool here is written and checked by hand, one at a time, by someone who wanted the tool to exist and could not find a version that showed its working.

No accounts and no sign-in, and nothing you type reaches a server — every calculation on this page runs inside your browser. The ads are served by Google and do set their own cookies, which is set out in full on the privacy page. More about the site.