Wet Decking Fastened at a Quarter Inch Dries to Almost Half

Pressure-treated lumber is sold wet and shrinks across the width. Boards laid tight open up to the right gap on their own.

Boards

 

Linear feet

 

Gap after drying

 

Screws

 

What each fastening gap becomes

The board count

Advertisement

How the calculation works

A wet 5.5 in board, six months later Laid tight 0.14 in right Laid at 1/4 in 0.39 in too wide Gaps drawn at 40 px per inch: 5.5 px against 15.5 px. Both boards shrank 2.5%. Only the fastening gap differed. The wood did the rest.

How to Use This Tool

Enter the deck, pick the material, and the tool sets a sensible fastening gap and predicts what it becomes once the boards reach service moisture.

The gap you fasten is not the gap you get

Pressure-treated decking is usually sold wet — often above 25 per cent moisture — because the preservative is forced in with water. In service it dries to around 12 per cent, and wood shrinks across the grain as it dries.

On a 5.5 in board, 2 to 3 per cent of shrinkage is 0.11 to 0.17 in. That is almost exactly the gap you want. So wet boards should be fastened tight against each other, and they will open up to the right spacing on their own.

5.5 in board, 2.5% shrinkage across the width = 0.138 in

fastened at 0        ->  0.138 in gap     about right
fastened at 1/8      ->  0.263 in gap     wide
fastened at 1/4      ->  0.388 in gap     too wide

kiln-dried or composite: no drying shrinkage,
so fasten at the gap you actually want.
The same board, three fastening decisions

Composite moves too, in a different direction

Composite and PVC boards barely change with moisture but expand and contract with temperature, mostly along their length. That is why manufacturers specify end gaps that vary with the installation temperature, and why butting composite tight against a wall on a cold day causes buckling in summer. Side gaps for composite are what you set and what you keep.

Board count, and why it rarely changes

Boards needed is the run divided by board width plus gap, rounded up. On a 12 ft span with 5.5 in boards, every gap from 1/8 to 1/4 in gives the same 26 boards, because the rounding absorbs the difference. The gap decision is about appearance and drainage, not quantity — which is another reason to set it by the moisture state rather than by what looks tidy at the yard.

Screws add up faster than people expect

Two screws per board per joist is the standard. A 12 x 16 ft deck at 16 in joist spacing has 13 joists and 26 boards, which is 676 screws. A 5 lb box holds roughly 350 of a typical 2.5 in deck screw, so that is two boxes, and running out on the last row is a specific kind of annoying.

Two things this does not size

Joists, beams and footings are structural and depend on span, species and load — check a span table and your local code. Picture-frame borders and diagonal layouts both add waste: diagonal decking needs joists at 12 in rather than 16, and every board gets two angled cuts.

Advertisement

Frequently Asked Questions

What gap should I leave between deck boards?
It depends on the moisture. Wet pressure-treated boards should be fastened tight, because they shrink about 0.11 to 0.17 in across a 5.5 in width as they dry. Kiln-dried and composite boards should be set at the gap you want, usually 1/8 to 1/4 in.
Why do my deck boards have huge gaps now?
They were almost certainly wet when installed and fastened with a gap as well. A 5.5 in board shrinking 2.5 per cent adds 0.14 in to whatever gap you started with, so a quarter-inch gap ends up near four tenths.
How many deck boards do I need for a 12x16 deck?
With 5.5 in boards spanning the 12 ft direction, 144 divided by 5.75 is 25.04, so 26 boards of 16 ft — 416 linear feet. Every gap between 1/8 and 1/4 in gives the same count, because the rounding absorbs it.
Is pressure-treated lumber wet when you buy it?
Usually yes. The preservative is forced in with water, so boards often leave the yard above 25 per cent moisture and dry to about 12 per cent in service. Kiln-dried after treatment, sold as KDAT, is the exception and costs more.
How many screws for a deck?
Two per board per joist. A 12 x 16 ft deck with 26 boards and 13 joists needs 676 screws, which is two 5 lb boxes of a typical 2.5 in deck screw.
Does composite decking need gaps too?
Yes, but for a different reason. Composite moves with temperature rather than moisture and expands mostly along its length, so manufacturers specify end gaps that depend on the temperature on the day you install it.

Related tools in Home & Construction

Browse all Home & Construction tools
The Mac mini the ecech. site is built on, beside a handwritten note reading ecech.com.

Made by one person

ecech. is not a content farm. Every tool here is written and checked by hand, one at a time, by someone who wanted the tool to exist and could not find a version that showed its working.

No accounts and no sign-in, and nothing you type reaches a server — every calculation on this page runs inside your browser. The ads are served by Google and do set their own cookies, which is set out in full on the privacy page. More about the site.