Map Renovation Dependencies, Earliest Starts and Schedule Float

Turn user-defined tasks and predecessors into an auditable critical-path draft.

Drop or choose a file up to 2 MB. Its contents replace the main text input; the filename alone is never treated as data.

Reviewable output

Processed

Warnings / conflicts

Output state

Advertisement

How the calculation works

Local inputboundedPer-item ruledeterministicArtifactcopy / download

How to Use This Tool

Turn user-defined tasks and predecessors into an auditable critical-path draft. Build a renovation dependency schedule from task durations, flag missing or circular links, calculate earliest starts and float, and export a timeline.

The work this page finishes

Renovation lists hide sequencing: a delayed rough-in can move inspection and drywall while an independent finish may still retain float. For Renovation Timeline, the row-preserving workspace makes a correction repeatable without rebuilding a prompt or transmitting the source file.

Rows or choicesValidate every itemReview and export
The six-task example branches after drywall and reports the critical sequence plus the shorter branch's float.

Deterministic workflow

Topologically order valid task-predecessor links, calculate earliest start/finish with a forward pass, then calculate project-relative float with a backward pass. For Renovation Timeline, this page accepts at most 5,000 records and 2 MB of text; rejected items retain their row references while valid items remain available.

Why a dedicated interface helps

Use zero-float tasks as coordination priorities and revise durations as facts change; the output is a transparent draft, not a completion promise. For Renovation Timeline, immediate recalculation and a stable export are useful when the same rule must be applied consistently across a list instead of explained one item at a time.

Assumptions

  • Durations are working-day estimates on one common calendar.
  • Predecessor labels match task labels exactly.
  • Dependencies are finish-to-start with no lag.

For Renovation Timeline, retain the original source until the destination accepts the result; processing stays in this tab, although the device and installed extensions remain part of the user's security boundary.

Limitations and review boundary

It does not infer construction logic, calendars, crews, permits, lead times, resource leveling, local code or contractor availability. For Renovation Timeline, no supplied URL is requested and no pasted markup or code is executed; output is inserted through text-only DOM operations.

Verification and provenance

The implementation was checked against U.S. GAO Schedule Assessment Guide on 2026-08-26, with fixtures for a known answer, an invalid input and a batch-specific edge condition. The six-task example branches after drywall and reports the critical sequence plus the shorter branch's float.

Sources & assumptions

Tool Spec v2 · verified 2026-08-26. Platform rules and fees can change; the editable inputs remain authoritative for your account.

Official references

Model assumptions

  • Durations are working-day estimates on one common calendar.
  • Predecessor labels match task labels exactly.
  • Dependencies are finish-to-start with no lag.
  • It does not infer construction logic, calendars, crews, permits, lead times, resource leveling, local code or contractor availability.
Advertisement

Frequently Asked Questions

What does Renovation Timeline complete?
It applies the stated planner rule to renovation timeline inputs and produces the reviewable output shown above.
Why use a dedicated Renovation Timeline page instead of chat?
The Renovation Timeline workflow preserves ordering, applies identical validation on every run and creates an artifact without conversational drift.
Does Renovation Timeline send the input to ecech?
No. Renovation Timeline reads pasted or selected content inside the current browser tab and does not call an ecech calculation API.
What verifies the default result?
The six-task example branches after drywall and reports the critical sequence plus the shorter branch's float.
When should I reject the output?
It does not infer construction logic, calendars, crews, permits, lead times, resource leveling, local code or contractor availability.
Which reference supports Renovation Timeline?
The recorded Renovation Timeline reference is U.S. GAO Schedule Assessment Guide, reviewed 2026-08-26.

Related tools in Home & Construction

Browse all Home & Construction tools
A handwritten note reading ecech.com resting on the keyboard used to build the site.

Made by one person

ecech. is not a content farm. Every tool here is written and checked by hand, one at a time, by someone who wanted the tool to exist and could not find a version that showed its working.

No accounts and no sign-in, and nothing you type reaches a server — every calculation on this page runs inside your browser. The ads are served by Google and do set their own cookies, which is set out in full on the privacy page. More about the site.