Six Tons of Gravel Go Under a Twelve by Sixteen Patio

The pavers are the visible cost. The compacted base underneath is the bigger pile, the longer day, and the reason it stays flat.

Pavers

 

Base gravel

 

Bedding sand

 

Base share of cost

 

The whole order

Base depth against material

Advertisement

How the calculation works

A section through a 12 x 16 ft patio pavers — 2.375 in 994 pavers bedding sand — 1 in 0.59 cu yd compacted base — 6 in 4.44 cu yd 6.2 tons Layers drawn at 8 px per inch. The base is two and a half times the depth of the pavers. It is also the heavier delivery, the longer day, and the reason it stays flat.

How to Use This Tool

Enter the patio and the paver, pick a pattern and a base depth. The paver count is the easy half; the base is the half that decides the budget and the weekend.

What actually goes under a patio

A paver surface is a flexible pavement. The pavers themselves carry very little — the compacted aggregate base spreads the load and drains the water, and the thin sand layer only sets the level. Skimp on the base and the surface settles, no matter how good the pavers are.

12 x 16 ft patio = 192 sq ft, 4 x 8 in pavers, herringbone

pavers   192 / 0.2222 = 864, +15% waste   =   994
base     192 x (6/12) = 96.0 cu ft        =  3.56 cu yd
         x 1.25 for compaction            =  4.44 cu yd
         x 1.4 tons per cu yd             =  6.2 tons
sand     192 x (1/12) = 16.0 cu ft        =  0.59 cu yd
edging   perimeter                        =    56 ft
The pavers are one line of five

Base depth is a soil question

Four inches suits foot traffic on firm, well-drained ground. Six is the usual patio figure. Eight or more is for driveways, soft ground or clay that holds water and heaves when it freezes. Depth scales the material linearly, so going from 6 to 12 inches doubles the delivery and doubles the compaction work.

Compaction means ordering more than the hole

Aggregate arrives loose and is installed compacted, losing roughly a quarter of its height as the fines are driven into the voids. Ordering the finished volume leaves the base short of depth. The base must also be compacted in lifts of no more than about four inches; dumping six inches and running a plate compactor over the top compacts the surface and leaves the bottom loose.

Edge restraint holds everything together

An unrestrained paver field spreads. The perimeter units creep outwards under load, the joints widen, sand escapes and the failure works inwards from the edges over a couple of seasons. Plastic or metal edging spiked into the base is cheap and not optional, and the base should extend six inches beyond the paver edge to support it.

Two different sands

Bedding sand is coarse and angular so it locks up under the pavers. Joint sand is finer, and polymeric joint sand contains a binder that sets. They are not interchangeable: bedding with fine sand gives a surface that keeps moving, and using bedding sand in the joints leaves them to wash out in the first heavy rain.

Advertisement

Frequently Asked Questions

How many pavers do I need for a 12x16 patio?
That is 192 sq ft. With 4 x 8 in pavers at 0.2222 sq ft each it is 864 before waste, or 994 with the 15 per cent allowance a herringbone pattern needs.
How deep should a paver base be?
Four inches for foot traffic on firm ground, six for a typical patio, eight or more for driveways, soft soil or clay. Depth scales the material linearly, so doubling the depth doubles both the delivery and the compaction work.
How much gravel goes under a patio?
A 192 sq ft patio at 6 inches is 3.56 cubic yards finished, or 4.44 to order once a 25 per cent compaction allowance is added — about 6.2 tons. That is usually a bigger material cost than the pavers.
Why do I need extra gravel for compaction?
Loose aggregate has air between the stones, and compaction drives the fines into those voids so the layer loses about a quarter of its height. Ordering the finished volume leaves the base shallower than specified.
Is edge restraint really necessary?
Yes. Without it the perimeter pavers migrate outwards under load, joints open, sand escapes and the field unravels from the edges inwards. The base should also extend about six inches past the pavers to support the edging.
What is the difference between bedding sand and joint sand?
Bedding sand is coarse and angular so it locks under the pavers; joint sand is finer, and polymeric versions contain a binder that sets. Swapping them gives either a surface that keeps moving or joints that wash out.

Related tools in Home & Construction

Browse all Home & Construction tools
The desk where ecech. tools get written: a laptop, a notebook of to-dos and a whiteboard listing the tools on the site.

Made by one person

ecech. is not a content farm. Every tool here is written and checked by hand, one at a time, by someone who wanted the tool to exist and could not find a version that showed its working.

No accounts and no sign-in, and nothing you type reaches a server — every calculation on this page runs inside your browser. The ads are served by Google and do set their own cookies, which is set out in full on the privacy page. More about the site.