App Phased Rollout Duration

Plan a staged rollout by audience size, daily adoption capacity, exposure checkpoints, and review holds before widening the release.

RELEASE OPERATIONS · REVIEW GATES

Plan the ramp and its review gates.

RELEASE PLAN● LOCAL

Choose planned exposure checkpoints and how long to hold each one while reviewing release health.

EXPOSURE PATH1% → 100%
STEP 1
STEP 2
STEP 3
STEP 4
TARGET
START1,000→AT TARGET100,000
ESTIMATED ROLLOUT WINDOW13.9 days

99,000 additional people at 10,000 per day, plus 4 planned hold days across 5 checkpoints. This is a planning model; it does not control a store release.

Currently exposed1,000
Target audience100,000
Ramp time9.9 days
Checkpoint holds4 days
◉

Put a review gate at every step

Pause a rollout when crash rate, startup errors, or support contacts move outside your release guardrails. This estimate only lays out the calendar; you decide whether to continue.

20.8%review gate40.6%review gate60.4%review gate80.2%review gate100%target

This model evenly spaces user-defined exposure checkpoints and hold periods. Actual adoption is not linear; store controls, opt-outs, automatic updates, pauses, and a changing eligible audience affect the calendar. Advance only while release guardrails stay healthy.

Need the complete version? Open all tool options

How this app works

Plan a staged rollout by audience size, daily adoption capacity, exposure checkpoints, and review holds before widening the release. Results update as you edit inputs; the formula and source link are shown beside the estimate.