COHORT HEALTH · RETURN CURVE
App Retained Users
Map a same-cohort retention curve across D1, D7, D14 and D30, then estimate how many original installers are active at a selected age.COHORT HEALTH · RETURN CURVE
See where the cohort thins out.
15.0% modeled retention at day 7. The curve is linearly interpolated between the four cohort checkpoints; values past day 30 hold at the Day 30 rate.
Follow one install cohort over time
Keep the denominator fixed at the original cohort size. Retention checkpoints estimate how many of those people were active again on each selected day.
Enter observed rates for one install cohort using the same denominator at every age. The selected day is linearly interpolated between checkpoints; after D30, this model holds the D30 rate flat. It is a planning estimate, not a measured value.
Need the complete version? Open all tool options
How this app works
Map a same-cohort retention curve across D1, D7, D14 and D30, then estimate how many original installers are active at a selected age. Results update as you edit inputs; the formula and source link are shown beside the estimate.