Skip to tool
ecech.
🏠 Home & Construction

Check Panel Schedule Arithmetic without Approving an Installation

Recalculate VA totals, phase sums and user-entered demand factors while keeping code decisions outside the tool.

Drop or choose a file up to 2 MB. Its contents replace the main text input; the filename alone is never treated as data.

Reviewable output

Processed

Warnings / conflicts

Output state

Advertisement

How the calculation works

Local inputboundedPer-item ruledeterministicArtifactcopy / download

How to Use This Tool

Recalculate VA totals, phase sums and user-entered demand factors while keeping code decisions outside the tool. Validate electrical load schedule arithmetic, recalculate connected and demand VA, compare phase totals, flag row errors, and export a review report.

The work this page finishes

A panel schedule can contain internally inconsistent multiplication or phase totals even before any code-specific demand method or installation judgment is considered. For Load Schedule Validator, keeping source order beside the computed artifact lets a user repair only the failed entries and reproduce the same batch later.

Rows or choicesValidate every itemReview and export
The sample recalculates three rows to 9000 connected VA and 7200 demand VA while exposing the phase spread from the entered schedule.

Deterministic workflow

For each valid row, multiply quantity by entered VA and demand percentage, aggregate demand VA by labeled phase, then compare active phase totals with an editable warning tolerance. For Load Schedule Validator, a run is capped at 5,000 items and 2 MB, preventing an accidental oversized paste while preserving successful rows when another row fails.

Why a dedicated interface helps

Use the report to find arithmetic and data-entry questions; a qualified designer or authority must select demand factors, phase assignment, service sizing and code treatment. For Load Schedule Validator, a purpose-built form exposes every assumption and returns the same ordered structure on every run, which is more practical than reconciling shifting conversational output.

Assumptions

  • VA values and demand percentages are supplied by the user.
  • A/B/C are labels, not inferred wiring.
  • The imbalance threshold is a review signal only.

For Load Schedule Validator, keep an untouched copy for comparison after import; the browser performs the work locally, but local software and extensions are not controlled by this page.

Limitations and review boundary

This is not a load calculation, permit document or safety approval and does not apply NEC rules, continuous-load factors, motors, neutral effects, voltage systems or local amendments. For Load Schedule Validator, the implementation neither follows user-entered links nor evaluates their contents, and it displays material as plain text rather than active HTML.

Verification and provenance

Fixtures derived from the displayed rule and NFPA — National Electrical Code were reviewed on 2026-08-26; they include normal, empty or invalid, and partial-failure behavior. The sample recalculates three rows to 9000 connected VA and 7200 demand VA while exposing the phase spread from the entered schedule.

Sources & assumptions

Tool Spec v2 · verified 2026-08-26. Platform rules and fees can change; the editable inputs remain authoritative for your account.

Official references

Model assumptions

  • VA values and demand percentages are supplied by the user.
  • A/B/C are labels, not inferred wiring.
  • The imbalance threshold is a review signal only.
  • This is not a load calculation, permit document or safety approval and does not apply NEC rules, continuous-load factors, motors, neutral effects, voltage systems or local amendments.
Advertisement

Frequently Asked Questions

What does Load Schedule Validator complete?
It applies the stated validator rule to load schedule validator inputs and produces the reviewable output shown above.
Why use a dedicated Load Schedule Validator page instead of chat?
The Load Schedule Validator workflow preserves ordering, applies identical validation on every run and creates an artifact without conversational drift.
Does Load Schedule Validator send the input to ecech?
No. Load Schedule Validator reads pasted or selected content inside the current browser tab and does not call an ecech calculation API.
What verifies the default result?
The sample recalculates three rows to 9000 connected VA and 7200 demand VA while exposing the phase spread from the entered schedule.
When should I reject the output?
This is not a load calculation, permit document or safety approval and does not apply NEC rules, continuous-load factors, motors, neutral effects, voltage systems or local amendments.
Which reference supports Load Schedule Validator?
The recorded Load Schedule Validator reference is NFPA — National Electrical Code, reviewed 2026-08-26.

Related tools in Home & Construction

Browse all Home & Construction tools
The desk where ecech. tools get written: a laptop, a notebook of to-dos and a whiteboard listing the tools on the site.

Made by one person

ecech. is not a content farm. Every tool here is written and checked by hand, one at a time, by someone who wanted the tool to exist and could not find a version that showed its working.

No accounts and no sign-in, and nothing you type reaches a server — every calculation on this page runs inside your browser. The ads are served by Google and do set their own cookies, which is set out in full on the privacy page. More about the site.